Rooftop Solar Power Plant at Wisma Bank Indonesia Makassar
Project Details
| Project Name | : | Rooftop Solar Power Plant at Wisma Bank Indonesia Makassar |
| Contract Scheme | : | EPC |
| Year of Construction | : | 2025 |
| Generated Capacity | : | 9.9 kWp |
| Location | : | Wisma Bank Indonesia, Makassar |
This project represents our first EPC order and aims to support the Bank Indonesia in enhancing its electricity self-sufficiency and minimizing its environmental footprint by installing a rooftop solar power system on one of the client’s existing employee dormitories in Makassar.
The annual power generation of this power plant is 15,424 kWh per year, with an annual reduction of 8.3 tons of CO2. Through the adoption of solar power as a renewable energy source in this project, ARISE hopes to contribute to the realization of a decarbonized and sustainable society.